Corporate DisclosureOLYMPIC
OLYMPIC Corporate Disclosure — 15 March 2026
Announcement summary
- What happened
- OLYMPIC published a corporate disclosure on 15 March 2026. Read the full announcement for details.
- Company
- Olympic Industries PLC.
- Announcement published
Original announcement
(Cont. news of OLYMPIC): charge equivalent to around of Tk. 8,033,684/- plus Local Engineering, Procurement and Construction Cost of Tk. 5,152,904/-) and installation and commissioning of the same at their Madanpur factory, Keodhala, Bandar, Narayangonj. b) One set Brand New Photovoltaic DC General (Rooftop Solar Power Plant) along with other necessary equipment having capacity 318.89 Kwp with total project cost (cont.4)
Bangla translation
A Bangla translation is under review because critical figures or dates did not match the English disclosure.
Source & verification
- Source
- Published company disclosure
- Published through
- Dhaka Stock Exchange
- Announcement ID
- 69b62dd0b322cf5e51795d81
- Original publication
- Last verified by BullBD